2 Sets of 10.5 MW Gas-Fired Boilers for Heat Supply Project

April 8, 2024

Available industries:Heating Industry

Project boiler medium:Hot water

Capacity:10.5 MW

Equipment:WNS10.5-1.6/115/70-Q

2 Sets of 10.5 MW Gas-Fired Boilers for Heat Supply Project

2 Sets of 10.5 MW Gas-Fired Boilers for Heat Supply Project

Introduction

The Aviation Enterprise Service Island project, located in the Airport Economic Zone near Beijing Daxing Airport, Langfang City, Hebei Province, is a significant investment with a focus on delivering continuous and stable heating supply. To meet the heating demands during the cold winter season, the project incorporates ZOZEN two sets of 10.5 MW WNS series gas hot water boilers.

Two sets of 10.5 MW gas-fired boilers are equipped with advanced combustion technology and heat exchange systems, enabling efficient energy conversion. These features optimize energy utilization and facilitate effective energy management, ensuring maximum heating efficiency for the Aviation Enterprise Service Island.

Designed to withstand the harsh winter environment of northern China, the boilers exhibit exceptional operational stability under various climatic conditions. Two sets of 10.5 MW gas-fired boilers are engineered to reliably meet the heating demand of the Aviation Enterprise Service Island throughout the winter season, ensuring uninterrupted operations in challenging weather conditions.

ZOZEN 10.5 MW gas-fired boilers comply with stringent environmental protection standards, both during manufacturing and operation. These boilers effectively control pollutant emissions, minimizing their impact on the environment and contributing to sustainable heating solutions for the Aviation Enterprise Service Island.

In addition to their performance, the total cost of the hot water boilers stands out among various options. Factors such as operational efficiency, maintenance requirements, and equipment lifespan have been carefully considered, making these boilers an economically viable choice for the project.

ZOZEN Boiler is committed to ensuring the smooth progress of the Aviation Enterprise Service Island project. ZOZEN provides comprehensive technical consultations and service support to assist customers at every stage of the project. This ensures efficient boiler operation and facilitates the successful implementation of the heating system.

More Boiler Cases

10 Tons Biomass Fired Steam Boiler for Power Plant

Available industries: Power Plant Project boiler medium:Steam Capacity:10 ton Equipment...

Biomass Steam Boiler Price in Pakistan

Available industries: Textile Mill Project boiler medium:Steam Capacity:15 ton Equipmen...

3.6 Million Kcal Gas Fired Thermal Fluid Heater

Available industries: Food Industry Project boiler medium:HMO (Heat Medium Oil) Capacity:...

20 Ton Coal Boiler in Kenya for Food Processing

Available industries: Food Processing Project boiler medium:Steam Capacity:20 tons Equi...